Geto Group is committed to building an integrated "solar-wind-storage-charging" demonstration park for clean energy. As a leader in aluminum formwork and prefabricated green building solutions, Geto Group leverages this "Zero-Carbon Park" to achieve sustainable production and contribute to China's green energy transition.
The project is implemented in two phases, both as commercial & industrial distributed generation systems:
● Phase 1 (2MW): Utilizes the corrugated steel roofs of three factory buildings.
● Phase 2 (4MW): Combines a flat-mounted steel roof with two elevated BIPV (Building-Integrated Photovoltaic) waterproof roofs on concrete structures, creating additional usable space.
This system fully meets the plant's operational electricity demand while enabling surplus power sales to the grid for additional revenue.
Phase 1 Project - Corrugated Steel Roof Flat Mount Installation
System Specifications:
● Installed Capacity: 2,034.32 kW; (3,448 × 580Wp photovoltaic modules)
● Projected Generation: First-year output: 1.985 million kWh; 25-year average annual output: 1.878 million kWh
● Environmental Benefits: Standard coal saved: 610.5 tons/year; CO₂ emissions reduced: 1,527.1 tons/year; Equivalent to planting 84,838 trees
Phase 2 Proect BIPV Elevated Structure Installation
Technical Specifications:
● Installation Method: Building-Integrated Photovoltaic (BIPV) elevated design
● Total Capacity: 4,033.58 kW DC (6,895 × 585Wp high-efficiency PV modules)
● Performance Projections: 25-year average annual generation: 3.725 million kWh
● Environmental Impact: Annual standard coal equivalent saved: 1,210.4 metric tons;
CO₂ emissions reduction: 3,027.8 metric tons/year
Carbon sequestration equivalent: 168,214 mature trees